This project was developed with the aim of upgrading technical infrastructure, revitalizing operational spaces, and enhancing the performance of the National Gas Dispatching Center. The project process encompassed the reorganization of existing areas, the upgrading of support infrastructure, and the coordination of equipment, technical spaces, and operational requirements.
Special attention was paid to operational continuity, infrastructure stability, spatial organization, and coordination between operational and support sections during the project’s design and execution. All project stages were carried out with the goal of creating a sustainable, efficient environment that meets the technical requirements of data centers and control facilities.
(Renovation and Revitalization of the National Gas Dispatching Center)
Client:
Location:
Size:
Status:
Date:
Type:
Related Projects