Gas-based server room fire suppression system banner

Renovation and Modernization of the Data Center and Supporting Facilities at the National Iranian Gas Dispatching Center

Rehabilitation and modernization of the Data Center at the National Iranian Gas Dispatching Center, including infrastructure upgrades, operational space optimization, and mission-critical facility improvements.

About this project:

This project was developed with the aim of upgrading technical infrastructure, revitalizing operational spaces, and enhancing the performance of the National Gas Dispatching Center. The project process encompassed the reorganization of existing areas, the upgrading of support infrastructure, and the coordination of equipment, technical spaces, and operational requirements.

Special attention was paid to operational continuity, infrastructure stability, spatial organization, and coordination between operational and support sections during the project’s design and execution. All project stages were carried out with the goal of creating a sustainable, efficient environment that meets the technical requirements of data centers and control facilities.

Server room at the National Gas Dispatching Center

(Renovation and Revitalization of the National Gas Dispatching Center)

Client:

We respect the confidentiality of this client

Location:

Middle East – Iran

Size:

170 m2

Status:

completed

Date:

2019-10-01

Type:

All Projects

Related Projects

Villa TIKA is a 366 m² two-unit villa designed around Caspian Sea and forest views, maximizing usable space through mezzanine levels within a 10-meter height limit.
Design and construction of a modern monitoring center for the Ministry of Petroleum, developed from Phase 1 to Phase 2 in compliance with ISO 11064 ergonomic control room standards.
Rehabilitation and revitalization of a medical facility for the National Iranian Oil Company, improving healthcare infrastructure, spatial quality, and operational efficiency.