This project was carried out as a renovation project based on ISO11064 standards. (Ergonomic design of control centers). We carried out the renovation to the structure of the building structural strengthening and physical development.
In addition, all the furniture was designed by our team based on ergonomic principles in ISO11064 In this center, we consider interior design as an important factor which causes variety in the center.
As a result, all the details of the interior design of the project are taken into consideration while designing. All these operations were conducted within 45 days, and the project was praised by the employer.
Project Revitalization and Development of the National Iranian Gas Dispatching Cente