Spatial improvement and reorganization of the 2,400 m² Sina Energy Holding headquarters, including workspace optimization, HVAC relocation, infrastructure upgrades, acoustic treatment, and lighting redesign.
Design and execution of a 400 m² Crisis Management Room and VIP Lounge for the National Iranian Gas Company, providing a secure, modern, and efficient environment for executive operations and strategic decision-making.
Rehabilitation and modernization of the Data Center at the National Iranian Gas Dispatching Center, including infrastructure upgrades, operational space optimization, and mission-critical facility improvements.
Design and construction of a modern monitoring center for the Ministry of Petroleum, developed from Phase 1 to Phase 2 in compliance with ISO 11064 ergonomic control room standards.
Revitalization and Development of the National Iranian Gas Dispatching Center based on ISO11064 standards, including structural strengthening, building expansion, ergonomic control room design, custom furniture, and interior renovation.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,
This extraordinary project was born of great vision and leadership on the client side, and goes well beyond a single control building to incorporate an entire camp of buildings that comprise a remote processing facility. This world-class LNG “megaproject” located on the northern shores of British Columbia provides an excellent example of BAW Architecture’s unsurpassed master planning expertise.